Tilcon managers tried several methods to mitigate buildup in
the hopper and alleviate clogging. The first method involved
the maintenance crew monitoring and resolving the clog
through a manual de-clogging procedure.
To clear the clog, both assigned staff members who were
trained and certified in confined space entry were fitted with a
harness attached to an emergency retrieval system. One
would enter the vessel and clear the clog and buildup using a
spade shovel supported by the other employee to ensure
immediate response to any issues, then they would switch
places at certain intervals. Previously, this was adequate to
get the material flowing for the rest of the shift, but with
greater production and changes in the climate, the prevalence
of clogging increased, which seriously impacted production.
Seeking solutions that would eliminate confined space entry,
operators first put large industrial vibrators on the hopper.
These would agitate surfaces and shake free buildup.
Unfortunately, they were inadequate for the job. Maintenance
found they could not deliver enough power to clear the clog
adequately and sometimes helped compact the material
further.
Operators then attempted to line the chute with a low-friction
liner. Chute supports inside the bin proved to be incredibly
challenging for proper placement and maintenance. The lining
would require periodic adjustment or cleaning, exposing the
team to the same confined space entry risks as normal
cleaning.
Staying with the slick liner concept, operators installed an
inflatable liner system. When buildup is detected, the liners
inflate using compressed air, dislodging it and sending it to the
center of the bin. Although the technology reduced the
frequency of cleaning, operators report that it was not highly
effective and still posed hazards and risks similar to those of
the liner system.
Silo Clogging Solutions
Having a long relationship with Tilcon through providing
conveyor belt cleaners and tensioning systems, plant operators
approached Martin Engineering to discuss implementing an air
cannon solution.
the hopper and to be completed during a scheduled outage or
downtime.
“After installation, the cannon's effectiveness was immediately
evident as a substantial amount of material was rapidly
discharged from the bins into our haul truck with just a few
quick blasts,” said Gere. “Observing the performance, we
knew we’d finally found our solution.”
Air cannons are placed in choke points, often indicated by hammer scars
from previous attempts to loosen material.
Tilcon’s air cannons are strategically placed for optimum effect when fired
in a sequence.
Results
After several months, operators found the solution freed
up two maintenance people for an entire shift. This
allowed them to allocate 16 additional hours per week to
other facility maintenance/safety tasks, translating to 64
monthly man-hours dedicated to greater efficiency.
According to managers, without buildup, the bins have
greater capacity. Most importantly, staff no longer need
to enter the vessel to clear clogs. “This one-time
investment eliminated our costs significantly on materials
and labor for cleaning the bins while ensuring our
personnel's safety,” Gere explained.
Modern air cannon designs offer easier and safer access for
maintenance and service.
Air cannons are pressurized tanks connected to a central
compressed air system. When triggered, they deliver a
powerful blast of air toward an area specified by the direction
and design of the nozzle. This blast is intense enough to
dislodge thick surface buildup and break apart compacted
material.
Installing and Testing Air Cannons on Hoppers
and Silos
For the testing phase, Martin Territory Manager Nabeel
Suleiman partnered with an internal support team to
strategically recommend and identify the placement of two
70-liter Martin® Hurricane Air Cannons with fan jet nozzles on